<?xml version="1.0" encoding="UTF-8" standalone="no"?><rss xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title>Allan Spear Construction: News</title><link>http://www.allanspearco.com:80/News.html</link><language>en-us</language><pubDate>Mon, 21 May 2012 04:37:24 EDT</pubDate><lastBuildDate>Mon, 21 May 2012 04:37:24 EDT</lastBuildDate><generator>CommuniSite RSS Generator</generator><docs>http://www.allanspearco.com:80/News.html</docs><ttl>0</ttl><atom:link rel="self" type="application/rss+xml"/><item><title>Work Started on Haven Hospice</title><link>http://www.allanspearco.com:80/News/825/Work-Started-on-Haven-Hospice.html</link><description>Allan Spear Construction has started work on the Haven Hospice Assited Living Facility in Orange Park Florida. The main focus of our work is stemwall and slab on grade. In addition to the work on site Allan Spear Construction provided the rebar shop drawings completed by the BIM Management Department.</description><author>John Moss</author><pubDate>Mon, 31 Oct 2011 00:00:00 EDT</pubDate></item><item><title>Allan Spear Iowa Bound</title><link>http://www.allanspearco.com:80/News/514/Allan-Spear-Iowa-Bound.html</link><description>Allan Spear Construction has been awarded the contract for the PapaJohn's Biomedical Facility at the University of Iowa. The project has nine floors.
Allan Spear Construction will be responsible for all the CMU work. We will use 2", 4", 6", 8" and 12" CMU. Some CMU will be glazed on one side, some on both sides and some will not be glazed at all. We will also be responsible for the granite and limestone cladding.
This represents our first project in the state of Iowa.</description><author>John Moss</author><pubDate>Fri, 28 Jan 2011 00:00:00 EST</pubDate></item><item><title>Spear Heads to Country Music Capital</title><link>http://www.allanspearco.com:80/News/470/Spear-Heads-to-Country-Music-Capital.html</link><description>Allan Spear Construction has been awarded the masonry contract for the Music City Center in Nashville, Tn. We will work in partnership with Bell/Clark, a Joint Venture.
The Music City Center is eight levels on a 750,000 square foot building footprint. It will have Ballrooms, Meeting Rooms, Exhibit Halls, and a truck dock located on level 5.
Allan Spear Construction will be responsible for all construction using Concrete Masonry Units (CMU), Brick, and Ground Faced CMU. The Music City Center represents our first foray in the city of Nashville. We look forward to our time there.</description><author>John Moss</author><pubDate>Tue, 14 Dec 2010 00:00:00 EST</pubDate></item><item><title>UF Biorefinery Pilot Plant Awarded to Allan Spear Construction</title><link>http://www.allanspearco.com:80/News/351/UF-Biorefinery-Pilot-Plant-Awarded-to-Allan-Spear-Construction.html</link><description>Allan Spear Construction is pleased to announce receiving the concrete and masonry contract from Whiting-Turner Construction for the University of Florida Biorefinery Pilot Plant.
Allan Spear Construction was awarded this contract on Wednesday, September 22nd and construction will start on Monday, September 27th. Working with our suppliers we can meet this fast turnaround which was required due to delays caused by a redesign of the project. As always, we will do all we can to meet the needs of our clients. In this case we will be able to get the project back on it's original schedule.
The plant, which is located just outside of Perry Florida, will have a foundation of pile caps, grade beams and piers. The slab on grade will have a trench drain which the middle third of the slab will slope down to. Due to the weight of the equipment that will be used the slab will be eight inches thick with #5 bars at ten inches on center each way. There will be concrete curbs throughout the plant. Ramps will also be needed to get equipment over the concrete curbs as well as for ADA compliance.
Check in regularly with our "Projects in Progress" page to see the progress.</description><author>John Moss</author><pubDate>Wed, 22 Sep 2010 00:00:00 EDT</pubDate></item><item><title>Rooms to Go Awarded</title><link>http://www.allanspearco.com:80/News/275/Rooms-to-Go-Awarded.html</link><description>Allan Spear Construction is proud to announce the awarding of the concrete contract for the Rooms To Go project in Toa Boja, Puerto Rico. This project is the building of a new warehouse store and the expansion of an existing warehouse. Keep an eye on our "Projects in Progress" page for pictures as we will soon start this project.
This tilt-wall project will keep us in Puerto Rico as we continue our work on the expansion of the Veteran's Administration Hospital in San Juan.</description><author>John Moss</author><pubDate>Thu, 15 Jul 2010 00:00:00 EDT</pubDate></item></channel></rss>